Waagner Biro Arch Bridges
The Youtefa bridge, Papua middle span project was carried out by a Consortium of 3 construction State-Owned Enterprised companies PT. PP, PT. Hutama Karya and PT. Nindya Karya (PP-HK-NK Consortium). The Konsorium appointed PT. Waagner Biro Indonesia to carry out design reviews, manufacturing, transportation and installation.
Kalikuto Bridge, Central Java. The uniqueness of this bridge is the design that uses steel box construction with hangers that are commonly used for cable-stayed bridges.
Original planned as a truss bridge, the design was modified following a suggestion by Waagner Biro Indonesia and now completed bridge was constructed.
At present, beside being a connecting line for two cities in South Kalimantan province, this bridge has also become an icon and tourism destination that is quite crowded to visit, especially on weekend.