From 2021 to 2022, Waagner-Biro Bridge Systems rented out a temporary road bridge to span the Perschling river in Kapelln. The tempoary bridge was used to divert traffic during construction works for an existing road bridge. Waagner-Biro supplied the rental bridge quickly from stock and supervised both its installation and dismantling.
Read MoreIn 2021, Waagner-Biro supplied 2 temporary bridges (rental bridges), 55m each, to a construction site near Munich. The bridge featured a U-frame design based on Waagner-Biro’s successful panel bridge system. The bridge was dismantled in 2023. Waagner-Biro is one of the main suppliers for temporary and modular steel bridging in Europe.
Read More