Holbein Bridge Frankfurt
Facts and Figures:
Place/Country: Frankfurt/Germany
Completion: 1990
Project type: Engineered Bridge (Suspension Bridge)
Client: J. G. Müller GmbH Baugesellschaft, Wetzlar; Architect: Speer & Partner
Description:
Planned in 1990 as temporary replacement of the "Eiserner Steg" which had been dismantled for restoration, the Holbein Bridge quickly found a place in the hearts of the inhabitants of Frankfort, so that the suspension bridge remained at its location. The steel supporting structure spans the Main River with a span of 142m and a total length of 210m. The width of the pedestrian bridge amounts to 4m. Two A-shaped towers with a total height of 32.7 m carry two main cables on which are affixed the inclined hanger cables. The steel weight amounts to 458 tons.